Skip to content
Termites and Wood Pests

Pre-Construction Termite Treatment

The best time to protect a new home from termites is before the concrete goes in. We coordinate with your builder, treat the soil along footings and under slabs at the right moment and document it for the builder and the buyer.

Pre-Construction Termite Treatment by Music City Pest Control
  • Best forBuilders, remodelers and owners building a new home or addition
  • Typical planPlan with the builder, treat at the right stage, document
  • TeamA crew that works around framers, plumbers and inspectors
  • Pairs well withBait stations, home sealing and new-home protection
What you get

What pre-construction termite treatment includes

  1. 1Timed to the buildWe schedule around footings, plumbing and slab pours so soil is treated when it is open.
  2. 2Documented workYou receive notes on where and how we treated, helpful for the builder's file and the home's records.
  3. 3A strong startTreating before the foundation is covered protects areas that cannot be reached later.
  4. 4Follow-on plansWe can set up baits or a regular plan once the home is finished.
How it goes

From the first look to the follow-up

  1. 1PlanWe talk with the builder about the schedule and the foundation type.
  2. 2PrepareWe check the soil and the forms and plan the treatment.
  3. 3TreatSoil along footings, slab edges and penetrations is treated.
  4. 4DocumentWe hand over notes and set up the next steps.
Good fit when

Is pre-construction termite treatment right for you?

  • You are building a new home or an addition
  • You are a builder who wants a reliable partner
  • You want protection to start on day one
  • You want a record for your files
Questions

About pre-construction termite treatment

When should pre-construction treatment happen?

Just before the slab or the foundation is covered, and again at certain stages if the build is long. We coordinate the timing with your builder.

Does it replace later termite protection?

No. It is a strong start, and a monitoring or baiting plan after the home is finished keeps protection going.

Can you treat a crawl space new build?

Yes. We plan the treatment for the footings, piers and any exposed soil.

Where we work

Find pre-construction termite treatment near you

Pick your city to see local conditions and the services people ask for most.

Thinking about pre-construction termite treatment?

Call or text, or send the form. Tell us what you are seeing and we will tell you how we would approach it.

Request a quote

Tell us what you are seeing.

Tell us where the property is, what the pest looks like and when you first noticed it. We read every message and reply with clear next steps.

  • What you have seen, where and when, so we can send the right technician with the right tools
  • A photo of the pest, the damage or the droppings, or a result you saved from a tool on this site
  • A plain-English plan: what we found, what we will do and what to expect, before we start
Prefer to talk? Call or text615-357-7797

Your pest control quote request

We only use your details to respond to your request.